Relief Ladder
Crews on duty, ordered by the hours they will have done when relieved — with the change point, the ETA there and whether a ready crew is waiting for them.
Crews on duty 0 gaps
Bands at 8 / 10 / 12 h. Red with the change point named = will cross 10 h there with no ready crew.
Lobby 3-hour outlook
Crews needed (trains waiting × 2 + crews due to be relieved there) against crews ready, every 30 minutes for 3 hours.